Bosch NET 682 C Manual de instrucciones Pagina 21

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 20
INSTALLATION
INSTALLATION INSTRUCTIONS
19
STANDARD PLUME
MANAGEMENT INSTALLATION
STANDARD PLUME MANAGEMENT INSTALLATION
8 718 682 335b (09.2008)
NOTE: to ease assembly of the flue components,
grease seals lightly with the solvent-free grease
supplied.
Check all the seals are seated properly in the
grooves provided and are in good condition.
All flue joints must be sealed to prevent leakage
of condensate and flue products.
Fitting the standard plume management
system:
1
Remove screws (C) and discard the
complete terminal end (D).
2
Fit the terminal bend (E) to the terminal
outlet and refix screws (C) to secure.
Rotate terminal bend (E) for angled fluing.
DO NOT rotate the complete flue terminal
assembly.
NOTE: the flue terminal outlet has built-in
stops to limit rotation for horizontal fluing
to allow condensate to run back into the
boiler for safe disposal. Do not attempt to
force beyond the limit stops.
All plume management sections must
rise by at least 173mm per metre (10°)
from the terminal to ensure that
condensate flows back into the boiler.
3
Mark, drill (protecting bend (E) from
debris) and fit clamp wall plug (G).
4
Screw clamp (F) into wall plug (G) to the
required distance as shown.
5
Push-fit the extension tube (H) as far as
possible into bend (E), then withdraw
10mm to allow for expansion.
6
Secure extension (H) to wall with clamp
(M) in position shown, using screws (J).
7
Push-fit outlet assembly (L) as far as
possible into the extension tube (H).
Rotate the outlet assembly (L) to the
direction required and secure to the
extension (H) with self-tapping screw (K)
supplied.
1
E
C
C
D
2
4
3
F
H
E
M
J
L
K
G
5
6
7
M
6
CONNECTORS
CLAMPS
±80°
65mm
4
F
10mm
Vista de pagina 20
1 2 ... 16 17 18 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios